edit-task
Home
Up
Delete
Task Name:
Task Description:
[UPDATE] ADDED the "list2" style to the to give it the articles style of list ] PRB list in articles was centered on page, list in steps was left aligned - the "form" with variables WAS closed before list,
TaskGroup ID:
Start Date:
Start Time:
Duration:
Priority:
Status:
To Do
Completed
In Process
Add Photo:
Owner ID:
Content:
use HTML
Edit Content
<h1 style="text-align: center;">title</h1> <h2>[previously]</h2> <ol> <li><strong>[2015-03-11] ADDED the "list2" style </strong></li> <ol> <li>] to the to give it the articles style of list VS no style</li> </ol> <li><strong>[2015-03-11] PRB list in articles was centered on page, list in steps was left aligned </strong></li> <ol> <li>CAUSE - the "form" with variables WAS closed before the list, in articles the list is inside of the form</li> <li>SOLUTION - MOVED the form tag to the bottom of the list</li> </ol> <li>]</li> </ol> <h2>[currently]</h2> <ol> <li>] </li> </ol> <h2>[next]</h2> <ol> <li>]</li> </ol> <p> </p> <p>[2015-03-10]</p> <p>] FIX PRB - TOOLBAR button - doesnt seem to pick out "Do, Doing Done items in systems correctly / consistently"</p> <p>] PG view/steps & view/articles</p> <p>*] "script" for "toolbar" is embedded in the page (toolbar-records.cshtml), uses server side variables in js</p> <p>X] view source for li<br />- looks like they have class="Do, Doing or Done"<br /><br /></p>